Service 02 of 04
Fit-out delivery and site supervision in Madinah
We build with our own in-house crews and supervise with an engineer dedicated to your project alone. A programme with milestone dates written into the contract, a weekly photo report wherever you are, and one party answerable for everything.

What you receive
What supervision means here
Supervision is not an occasional visit. These outputs are written into the contract and reach you on fixed dates throughout the project.
- 01
Milestone programme
A delivery date for each stage, written into the contract and measured against.
- 02
Line-by-line bill of quantities
Every item priced, quantified and specified before work starts. No open items.
- 03
A named project engineer
One person whose name and number you have, following the site and answering your questions.
- 04
Weekly photo report
Site photos, percentage complete and next week's plan, sent on WhatsApp.
- 05
Quality checks before closing up
Services and first fix inspected and photographed before anything is covered.
- 06
Handover walk-through and warranty
A walk-through with you item by item, a final clean, and a one-year warranty on the workmanship.
Who it is for
Three kinds of space

Residential
Villas, apartments, majlis rooms and rest houses. We start from how the family lives, not from a catalogue.

Commercial
Restaurants, cafes, showrooms and clinics. Design that serves the brand and the operation at once.

Offices
Company headquarters and professional offices. Clear circulation, controlled acoustics, lighting that rests the eye.
Build stages
From site handover to key handover
The duration is fixed in the contract after the visit. A three-bedroom apartment usually takes six to ten weeks after the design is approved; a villa fourteen to twenty-four.
- 01
Site handover and setup
Protecting existing surfaces, setting up work routes, and delivering the first material batch.
- 02
First fix
Electrical, plumbing and HVAC to the design drawings, inspected before closing up.
- 03
Finishes
Gypsum, floors, paint and lighting, sequenced so nothing has to be redone.
- 04
Installation and handover
Joinery installed, a final clean, the handover walk-through, then the warranty.
Fees and terms
How the build is priced
The build is priced with a line-by-line bill of quantities once the design is approved, never as an opaque lump sum. Any change during the works is issued as a priced variation order that you sign before it is carried out.
- Pricing basis
- Line-by-line bill of quantities
- Changes during the works
- Priced, signed variation order
- Warranty
- One year on workmanship

FAQ
About this service — Execution and supervision
Yes. We review the drawings technically, prepare a bill of quantities, and build with the same supervision we give our own designs.
Every change is issued as a written variation order stating its effect on price and programme, and is not carried out until you sign it.
Yes, a one-year warranty on the workmanship, in addition to the suppliers' own warranties on equipment and materials.
Our in-house crews work on site, and the project engineer visits, documents and issues the weekly report.